| |
| Offshore containers and basket |
 |
| The contract of containers and baskets in
Balikpapan and Handil East Kalimantan
base on DNV or ABS standart with scope: |
| Design calculation |
| Procurement |
| Fabrication |
| Blasting Painting |
| Load test and certification |
| Maintenance |
|
|
| |
| Pressures Offshore Cabin 4 Units |
| The contract from Chevron at East Kalimantan for
Provision of 1 unit Laboratory, 1 unit office and 2
units Maint Shop with specification: |
| ABS Certification / Compliance |
| A60/H60 Bulkhead material for building walls |
| VAC Integrated with Pressurizing Unit |
| Equipped with Relief Damper / Exhaust Fume Hood |
| Suitable with Class 1 Div 2 Grade D area |
|
|
|
| |
| Mooring buoy franklin offshore |
 |
| The contract for Mooring buoy (Dimension 4,5 Meter Dia x7,0 Meter Leght) at East Kalimantan base on ABS
standar with with scope of works : |
| Design Calculation |
| Procurement &
Fabrication |
| Blasting Painting |
| Certification |
|
|
| |
| |