| PAITON POWER PLANT UNITS 1 & 2 PT. PLN (PERSERO), East Java |
| The Contract of Coal Handling System including Ship un-loader (1750 TPH) from PT. PLN for design, Fabrication, Erection and
Commissioning in Paiton East Java |
| |
|
|
| |
| ASH HANDLING PLANT C-63 SURALAYA SPP UNIT 5,6 & 7 – PT. PLN, Suralaya - Banten |
| The Suralaya Steam Power Plant unit 5, 6 & 7 comprising of Design , Supply, Erection, Construction and Commissioning of the Ash Handling plant with scope: |
| |
| 1. |
Bottom Ash System |
 |
| 2. |
Fly Ash System |
| 3. |
Economizer Ash System |
| 4. |
Pulverized Reject System |
| 5. |
Accessories |
| 6. |
Penetrating |
| 7. |
Control and Local and Specialized Instrumentation,
including Hardware and Software for the Datalink |
| 8. |
Local Instrument Enclosures |
| 9. |
All Electrical, Instrumentation, and Control Design
Information and Documentation |
| 10. |
Fire Protection Equipment |
| 11. |
Space Conditioning Equipment for all Areas Requiring |
| 12. |
Space Conditioning |
| 13. |
Thermal and Anti sweat Insulation |
| 14. |
Weathertight Rainhoods to all Equipment / Pipe work |
| 15. |
External Cladding |
| 16. |
Interface with DCIS |
| 17. |
Supporting Steel Work |
|
| |
| CONVEYOR RO-RO JETTY SURALAYA PT. INDONESIA POWER PLTU SURALAYA, Suralaya Banten |
| The Contract For Additional Facility And Rehabilitation of The Coal Handling and Preparation Plant of Design, Manufacture, Supply, Erection and Commissioning of The Following : Conveyor C3, C4, C5, C5A, Transfer Conveyor, Control System, Electrical an Power
Hopper |
| |
|
|
| |
| ASH HANDLING PLANT PLTU TANJUNG ENIM - PLN PT. BETANIA PRIMA, Tanjung Enim South Sumatera |
| Plant System Division of PT. Bukaka Teknik Utama have Joint Operation with PT. Betania Prima for Fly Ash Handling System in PLTU Tanjung Enim Owned by State Electricity (PLN Sektor Pembangkit Sumatera Bagian Selatan) |
| |
|
|
|
|
| |
|