| To ensure all product leaving our factory and installed at the project site meet quality standard, we conduct the following control/test according to ISO 9001 : |
| |
|
| - |
Input and Output Control |
| - |
Checking the tickness of Zinc, Coating, Composition, Uniformity, adhesivity to the steel structure surface,
ZincCoating weigth test, etc |
| - |
Assembly Testing |
| - |
Checking of the packing and marking, etc |
| - |
Check and have all products delivered at site before installation schedule |
| - |
Final check after installation |
| - |
Final overall test to the complete T/L |
|
| |
| |